Energy Audit at Dairy
plant at Gomtipure, Gujarat. |
|
|
| |
A comprehensive
energy conservation study of the Dairy plant at Gomtipure,
Gujarat. was carried out by PCRA.This Dairy is engaged in
the manufacture of various qualities of milk & also other
milk products like buttermilk & ghee in their plant. The
total milk received per day is around 1.60 Lakh litres. Annual
Production of the plant Liquid milk – 51046.6 kl. There
are 2 nos. boilers-, both oil fired 1 TPH each, for generating
steam for use in the plant. One
boiler is in operation & the other is stand by.
Annual F.O/LDO consumption is 433.55 Kl. The unit takes its
electricity supply from the GEB .The contract demand is 500KVA.
Electricity is
consumed in a variety of equipment in the refrigeration plant
compressors & auxiliary equipment
like cooling & chilled water pumps, air compressors, water
& milk pumps & lighting. Annual electricity consumption
is 23.78 LakhKWH
A comprehensive energy conservation study
of the plant was carried out by PCRA, The identified total
annual energy saving potential is around Rs. 26.17 Lakhs on
a recurring basis. The energy audit has identified several
areas for energy conservation in thermal & electrical
energy. The steps identified for energy conservation are given
below:
- The excess air levels in the boilers is very much on
the higher side. It is recommended that the unit replace
the present nozzle with a new nozzle. It is also recommended
that the unit procure a
combustion analyzer & reduce the excess air levels
such that the oxygen % in the flue gases is 3.0%. This
will result in improvement in boiler efficiency.
- It is recommended that the unit descale the water side
of the boiler. This will increase heat transfer from the
flue gases to the water leading to lower flue gas temperature
& higher boiler efficiency.
- Furnace is stored in 2 nos.main storage tank of capacity
20000 lts each. It is recommended that the furnace oil
storage & service tanks should be drained at least
once a week. This will ensure that all the water is removed
from furnace oil & prevent sludge formation.
- Steam line insulation was in good shape in the plant
in. However, some the valves & flanges on
the PRV stations are not insulated in the plant. It is
recommended that the valves & flanges be
insulated with box type insulation to reduce radiation
losses.
- It is observed that 3 traps is found to be blowing
I.e. leaking steam. The total nos. of steam traps tested
is 11. Also 1 trap was found to be having body leak It
is recommended that these traps be also attended to.
- It is recommended that the condensate be recovered
from the CIP hot water tank trap as well as
from the pasteurizer hot water tank overflow.
- The power factor of the plant is satisfactory. However,
it is observed that it fluctuates from month to month.
The average power factor for the dairy is 0.984. It is
recommended that the power factor be improved to unity
consistently. This will result in savings in electrical
bills .
- The contract demand for the dairy is 500 KVA &
the minimum billable maximum demand is 425
KVA. It is recommended that the contract demand be reduced
to 440 KVA. This will reduce the
minimum billable maximum demand to 374 KVA & lead
to a reduction in the electricity bills.
- The air compressor & the identified pump motors
are overloaded. It is recommended that the air
compressor & all the pumps identified be inspected
& serviced to reduce the power consumption.
- When an induction motor is rewound , its efficiency
drops by at least 1 % each time it is rewound.
This results in excessive power consumption in these motors.
It is recommended that these motors be replaced with new
high efficiency motors. This will result in savings in
electricity. Besides savings in electricity, savings in
rewinding costs are also realized. It is recommended that
pump motors be monitored every month for seal leakage
& the seals replaced on a monthly basis for the pump
motors. This will reduce motor burnout & result in
improvement in motor efficiency.
- It is recommended that the refrigeration section be
modernized by installation of an instant chiller, screw
compressor , PHE condenser & a forced draught cooling
tower.
- Along with the compressor, the IBT also has to be modernized.
It is recommended that liquid level
controller & ice thickness controller be installed
on the IBT. This will reduce power consumption
in the refrigeration section.
- Present lighting single phase voltage is 210 to 215
volts. Nowadays lighting transformers are
available, which reduce the voltage to around 200 volts.
The reduction in voltage also reduces
power consumption with little reduction in lumens emitted
by the light source. The savings due to
installation of lighting transformer is 20% of the power
consumption.
|
|
|
| |
| For further information, please write to:
Director (I/C),
PCRA,
Sanrakshan Bhawan, 10,
Bhikaji Cama Place,|
New Delhi-110066
Telephone: +91-11-26198856
Fax. +91-11-26109668
Web site: www.pcra.org |
|
|
| Powered by: Webdunia |
© Petroleum Conservation Research
Association, India |
|