PCRA identifies the site of the demonstration centers and
an agency of repute is engaged to install and operate the
demonstration centers. The executing agencies procures, install
and commission a set of the efficient pumping system conform
to BIS – specifications and the inefficient pump system
(complete in all respects and including foot valve, suction
and discharge pipe, pumping set, diesel engine along with
the proper base) at each of the locations. The inefficient
pumping system is representative of locally available system
in that area but of exactly same size/rating as the efficient
system.
During the time of commissioning of the demonstration center
wide publicity is given in nearby villages and a small function
is arranged with the involvement of opinion makers like village
Sarapanch, School Teachers, Gram Sewaks, Village Level Mechanics
etc.
Both the efficient and inefficient systems are operated for
600 hrs. Each in an year to demonstrate the savings possible
through the adoption of efficient system over the inefficient
system. The representative of executing agency educates the
farmers on the pumping system. A display board describing
the advantages of efficient pumping system vis-à-vis
the inefficient pumping is mounted at each site for the information
of the farmers. A register is maintained at the demonstration
centers where the visitors enter their observations like working
of the system, how it has enhanced their awareness on efficient
pumping system & on Oil Conservation along with their
personal data (like name, village, education, farm holdings,
pump sets ownership, diesel consumption etc.) The visitors
are suggested to preferably put their signature or put thumb
impression in case they are illiterate.
The executing agency maintains a proper logbook in which
pump running hours, water flow rate, diesel and lube consumption
data for both the systems are recorded. A PCRA inspection
team visits the premises of camps on random basis to supervise
and observe the performance of the camps. The total cost of
installing the demonstration center and the operation expenses
are borne by PCRA. |